Working groups area


C1.DAG System Development
C1.MAG Asset management
C1.BAG Business Management
C1.TAG Tutorials
WGC1-9 Planning issues for newly industrialised and developing countries (Africa)
WGC1-10 Glossary of Terms Used in the Electricity Supply Industry
WG C1-12 The Impact of Transmission Codes on the Planning of Systems
WGC1-13 System Complexity and Dynamic Performance
WGC1-14 Review of Transmission Planning Access Requirements
WGC1-15 Review the drivers for transmission investment decisions and the role of technical planning criteria in transmission investment
WGC1-16 Transmission Asset Risk Management
WGC1-17 Planning to Manage Power Interruption Events
WGC1/C2/C6-18 Coping with limits for very high penetrations of renewable energy
WGC1-19 Green field network, designing future networks ignoring existing constraints
WGC1-20 Accommodating high load growth and urban development in future plans
WGC1-21 What advanced components and technologies are needed and which are available or under development to meet future network development requirements? What are the limits on their use?
WGC1-22 New investment decision processes required to deal with changing economic drivers
WGC1-23 Transmission investment decision points and trees
WGC1-24 Tools for developing Optimum Network Development Plans
WG C1-25 Risk Management and Information Processes for Asset Management in Electricity Transmission Companies for current and future power systems