Structure
Chairman: Phil Southwell
Secretary: Peter Roddy
ADVISORY GROUPS
Ref:
Title:
Convener:
Duration: 4 years
C1.DAG
System Development
Leslie Bryans
2004 - 2008
C1.MAG
Asset management
Eric Rijks
2008 - 2012
C1.BAG
Business Management
Konstantin Staschus
2008 - 2012
C1.TAG
Tutorials
Keith Bell
2008 - 2012
Working Groups - Task Forces
Ref
Title
Convener
Dates
(Creation - Disbanding)
WGC1-9
Planning issues for newly industrialised and developing countries (Africa)
Riaz Amod Vajeth
2004 - 2010
WGC1-10
Glossary of Terms Used in the Electricity Supply Industry
Anca Popescu, Bill Reinke
2004 - 2006
WG C1-12
The Impact of Transmission Codes on the Planning of Systems
Yusof Sallehudin
09/2006 - 08/2008
WGC1-13
System Complexity and Dynamic Performance
Hans Abele
2006 - 2008
WGC1-14
Review of Transmission Planning Access Requirements
Paulo Esmeraldo
2006 - 2008
WGC1-15
Review the drivers for transmission investment decisions and the role of technical planning criteria in transmission investment
Adele Sleator
2009 - 2011
WGC1-16
Transmission Asset Risk Management
Eric Rijks
2007 - 2009
WGC1-17
Planning to Manage Power Interruption Events
Keith Bell
2007 - 2009
WGC1/C2/C6-18
Coping with limits for very high penetrations of renewable energy
Jonathan O'Sullivan
2008 - 2010
WGC1-19
Green field network, designing future networks ignoring existing constraints
Hiroshi Suzuki
2009 - 2011
WGC1-20
Accommodating high load growth and urban development in future plans
Kevin Leask
2009 - 2011
WGC1-21
What advanced components and technologies are needed and which are available or under development to meet future network development requirements? What are the limits on their use?
Andrea Mansoldo
Sept 2009 - April 2011
WGC1-22
New investment decision processes required to deal with changing economic drivers
Olivier Herz
2009 - 2011
WGC1-23
Transmission investment decision points and trees
Ronald Marais
2009 - 2011
WGC1-24
Tools for developing Optimum Network Development Plans
David Bones
Sept 2009 - Aug 2011
WG C1-25
Risk Management and Information Processes for Asset Management in Electricity Transmission Companies for current and future power systems
Eric Rijks
02/2010 - 09/2012